Arroganttiom

Arroganttiom Boho Round Tablecloth 60 Inch | Stain-Resistant, Water-Repellent & Wrinkle-Free

High-performance kitchen and dining made for confident daily results

$26.35

3 shoppers currently have this item in cart.

Low stock: only 5 left in inventory. Add to cart before it's gone.

Shop Pay installment options may appear at checkout where eligible.

Free shipping Secure checkout 100% refund eligible
Bundle & save Buy 2 and save checkout time

Premium kitchen and dining quality selected for United States (USA) customers.

Routine pack Build your routine pack (3)

Fast dispatch with always-free shipping and secure checkout on every order.

Free shipping

i

Free shipping on every order. Fast dispatch, tracked delivery, and secure checkout included.

Easy returns

i

Simple return flow and responsive support for eligible items.

Peak-demand shipping delays

i

During high demand, deliveries may experience short carrier delays. Tracking updates remain active for every order.

24/7 customer support

Questions before checkout? Our team is available and ready to help.

Share

Why customers choose Oico Home, Kitchen and Dining

Boho Charm for Every Table

Elevate your dining spaces with the Arroganttiom Boho Round Tablecloth. Sized at 60x60 inches, it drapes gracefully over round tables, adding a colorful, energetic touch to kitchens, dining rooms, patios, and event setups. The back remains white, offering a clean canvas that works with a wide range of dishware and decor styles.

Smart Materials, Real-World Benefits

Crafted from 100% polyester woven silky satin, the fabric has a smooth, inviting sheen and a soft handfeel. It’s designed to be wrinkle-free for quick, ready-to-dine tablescapes. The color stays vibrant thanks to modern digital printing, helping hues resist fading through everyday use.

  • Stain resistant surface helps keep the cloth looking fresh during meals and celebrations.
  • Water-repellent finish adds practical protection for outdoor dining and spills.
  • Durable, long-lasting construction is suitable for frequent use at home, in cafes, or in restaurants.

Versatility for Any Occasion

From casual weekday dinners to festive parties, this tablecloth complements most tableware and decor. It’s sturdy enough for indoor dining and stylish enough to brighten outdoor gatherings, creating a cohesive look for intimate meals or larger events.

  • Pairs well with colorful plates, napkins, and placemats to craft a coordinated table setting.
  • Ideal for photo-worthy tablescapes and versatile enough for hospitality spaces.

Easy Care and Longevity

Maintenance is straightforward: wipe with a damp cloth for quick refreshes, or machine wash cold when needed. Do not bleach; if ironing is desired, use a low heat setting from the back of the fabric. This approach supports a neat, presentable table setup with minimal effort.

Arroganttiom backs this tablecloth with a customer-focused approach, aiming to offer a practical, decorative piece that enhances everyday dining and special occasions alike. While results vary, users may enjoy a vibrant, low-maintenance table setting that adapts to many moments.

FAQ

Q: What is the size of the tablecloth?

A: The tablecloth measures 60 by 60 inches, suitable for standard round tables.

Q: How should I care for this tablecloth?

A: Wipe with a damp cloth for quick cleaning; machine wash cold; do not bleach; iron on low from the back if needed.

  • Free US-Wide Shipping

    Every order ships free — no minimum.

  • 30-Day Returns

    Easy returns within 30 days of delivery.

  • Secure Checkout

    Encrypted payments, all major cards.

  • 10% Off First Order

    Use code OICO10 at checkout.